Table 2 Interpretation of System Level Uncertainty in Proximity

From: Uncertainty-aware visualization and proximity monitoring in urban excavation: a geospatial augmented reality approach

Probability

Distance

Interpretations

>=

60%

1 m

At least a 60% probability the bucket is at least d (1 m) away from the utility

<=

40%

1 m

At most a 40% probability the bucket is at most d (1 m) away from the utility

>=

85%

0 m

At least an 85% probability the bucket will NOT hit the utility

<=

15%

0 m

At most an 15% probability the bucket WILL hit the utility