Skip to main content

Table 1 Sling lengths before removing the loading from the frame during lifting

From: Combining photogrammetry and robotic total stations to obtain dimensional measurements of temporary facilities in construction field

Slings

[08.22.06 am] T0

[08.22.12 am] T1

[08.22.19 am] T2

A(L.)

21472

21469

21480

B(L.)

18193

18193

18193

C(L.)

16257

16251

16250

C(R.)

16270

16258

16264

B(R.)

18217

18217

18213

A(R.)

21475

21551

21469