Skip to main content

Table 2 Sling lengths after removing the loading from the frame during lifting

From: Combining photogrammetry and robotic total stations to obtain dimensional measurements of temporary facilities in construction field

Slings

[10.18.37 am] T3

[10.18.45 am] T4

[10.19.42 am] T5

A(L.)

21462

21455

21451

B(L.)

18197

18189

18178

C(L.)

16273

16258

16259

C(R.)

16265

16260

16259

B(R.)

18197

18184

18223

A(R.)

21508

21435

21560