Table 2 ANOVA results showing correlation between the factor; delay experienced in dealing with the budget query with a number of dependent variables namely; the frequency of problematic issues during the remote construction project’s period , (level of significance <0.05)

From: The potentials of and barriers to the utilization of advanced computer systems in remote construction projects: case of the Kingdom of Saudi Arabia

Dependent variable: the frequency of problematic issues during the remote construction project’s period (i.e. from start to completion Independent variable (factor): the delay experienced in dealing with the budget query
Sum of Squares df Mean Square F Sig.
Mistakes in construction works Between Groups 6.105 4 1.526 2.758 0.043
Within Groups 18.818 34 0.553  
Shortage in site equipment Between Groups 15.838 4 3.959 3.934 0.01
Within Groups 33.215 33 1.007  
Delay in the conduction of field survey by the contractor Between Groups 15.123 4 3.781 5.469 0.002
Within Groups 22.121 32 0.691  
Unavailability of the supervision engineers during sample testing stages Between Groups 19.735 4 4.934 5.869 0.001
Within Groups 27.739 33 0.841  
Improper construction methods implemented by the contractor Between Groups 5.554 4 1.388 3.325 0.022
Within Groups 13.365 32 0.418  
Inadequate equipment used Between Groups 10.849 4 2.712 4.082 0.008
Within Groups 22.587 34 0.664