Table 3 How fast the ACMS would accelerate the feedback of the remote construction site’ queries, (Mean value scale: 1 = do not accelerate to 5 = highly accelerate)

From: The potentials of and barriers to the utilization of advanced computer systems in remote construction projects: case of the Kingdom of Saudi Arabia

Type of the remote construction site’s query Mean Std. deviation Skewness
Reporting QA/QC problems 4.13 0.992 -0.825
Contract drawings 4.11 0.841 -0.468
Reporting the site inspection outcomes 4.06 0.942 -0.62
Clarification of Design information 4.02 0.944 -1.016
Accident reporting 3.96 1.083 -0.879
Violations reporting 3.94 1.131 -1.001
Progress reporting 3.91 1.08 -1.014
Revisions to submittals 3.89 0.983 -0.209
Initiate site inspections 3.89 1.005 -0.45
Contract specifications 3.83 1.018 -0.693
Updated Schedule 3.83 1.253 -0.72
Sample test results 3.77 1.165 -0.812
Exception reporting 3.74 1.206 -0.879
Meeting minutes 3.68 1.163 -0.72
As-built records 3.64 1.293 -0.73
Delay records 3.63 1.388 -0.752
Subcontractor work’s progress information 3.48 1.11 -0.452
Products Catalog 3.36 1.342 -0.368
Budget 3.33 1.266 -0.242
Material cost accounting 3.26 1.307 -0.447
Equipment cost accounting 3.2 1.222 -0.316
Visitor’s log 3.13 1.377 -0.135