Figure 12 | Visualization in Engineering

Figure 12

From: Application of BIM coordination technology to HSR Changhua station

Figure 12

Facility management equipment. a. Integration of disciplines: clash detection of column A between structure and architecture. b. Assistance of reviewing girder elevation. c. Import 2D CAD into BIM structure model. d. Compare section of column A with 2D shop drawing. e. RM. No. 177 Generator RM. Incorrect position of exhaust vent and the louver. f. RM. No. 124 Station storage RM. MEP piping conflicts with the elevator pit. g. LINE 7.2-8.2 & LINE B-E Ground level, duct and vent conflict with exsiting bridge. h. Water Piping and duct elevation are below ceiling height. i. Operation Equipment maintenance data input. j. Mechanical Equipment maintenance data input.