Fig. 9From: Cell-based construction site simulation model for earthmoving operations using real-time equipment location dataTransformation of the site into a cell-based grid system: (a) Satellite or UAV image, (b) Simplified site layout map with zones, and (c) Construction site divided into cellsBack to article page