From: Resource-loaded piping spool fabrication scheduling: material-supply-driven optimization
Material name | Quantity |
---|---|
6″, Sch.40 Pipe | 23 meter |
2″, Sch.80 Pipe | 1 meter |
3″, Sch.40 Pipe | 1.3 meter |
2″, Sch.80 Elbow | 1 |
6″, Sch.40 Elbow | 4 |
2″, Sch.80 Flange | 1 |
3″, Sch.40 Flange | 1 |
2″ × 6″, Sch.80/Sch.40 Olet | 1 |
6″ Hydro pipe | 1 |
6″ × 3″, Sch.40 Reducer | 1 |
6″, Sch.40 Tee | 1 |