TY - STD TI - AbouRizk, S. and Halpin, D. (1990). Probabilistic Simulation Studies For Repetitive Construction Processes. Journal of Construction Engineering and Management, Vol. 116, No. 4, ASCE, ISSN 0733-9364/90/0004-0575 ID - ref1 ER - TY - STD TI - AbouRizk, S., Halpin, D., and Wilson, J. (1994). Fitting Beta Distributions Based on Sample Data. Journal of Construction Engineering and Management, 10.1061/(ASCE)0733-9364(1994)120:2(288), 288–305. ID - ref2 ER - TY - STD TI - Eiris Pereira, R. (2016). Impact of Linear Correlation on Construction Project Performance Using Stochastic Linear Scheduling. Master Thesis, Rinker School of Construction, University of Florida, Gainesville, FL. ID - ref3 ER - TY - STD TI - Flood, I., Issa, RRA, and Troffin, I. (2004). “Optimization of Stochastic Linear Schedules”, in proceedings of 11th International Workshop, EG-ICE, Weimar, May 2004, pp 182–189. ID - ref4 ER - TY - STD TI - Gates, M. and Scarpa, A. (1972) Learning and experience curves. Journal of the Construction Division, ASCE, 98(CO1), March, proceedings papers 8778, pp. 79–101. ID - ref5 ER - TY - STD TI - Harris, R. and Ioannou, P. (1998). “Scheduling Projects with Repeating Activities.” Journal of Construction Engineering and Management, 10.1061/(ASCE)0733-9364(1998)124:4(269), 269–278. ID - ref6 ER - TY - STD TI - Ioannou, P. G., and Srisuwanrat, C. (2006). Sequence Step Algorithm for Continuous Resource Utilization in Probabilistic Repetitive Projects. Conference Proceedings of the Winter Simulation Conference, WSC 2006, Monterey, California, USA, December 3–6, 2006. ID - ref7 ER - TY - STD TI - Ioannou, P. G., and Srisuwanrat, C. (2007). Optimal Scheduling of Probabilistic Repetitive Projects Using Complete Unit and Genetic Algorithm. Conference: Proceedings of the Winter Simulation Conference, WSC 2007, Washington, DC, USA, December 9–12, 2007. ID - ref8 ER - TY - STD TI - Ioannou, P., and Srisuwanrat, C. (2007a). Probabilistic Scheduling for Repetitive Projects. Conference: Lean Construction: A New Paradigm for Managing Capital Projects - 15th IGLC Conference 2007, Pages 498–507 ID - ref9 ER - TY - STD TI - Ioannou, P. G., and Srisuwanrat, C. (2007b). Simulation and Optimization for Construction Repetitive Projects Using Promodel and Simrunner. Conference: Proceedings of the 2008 Winter Simulation Conference, Global Gateway to Discovery, WSC 2008, InterContinental Hotel, Miami, Florida, USA, December 7–10, 2008. ID - ref10 ER - TY - JOUR AU - Pérez, F. AU - Granger, E. G. PY - 2007 DA - 2007// TI - IPython: a system for interactive scientific computing JO - Computing in Science and Engineering VL - 9 UR - https://doi.org/10.1109/MCSE.2007.53 DO - 10.1109/MCSE.2007.53 ID - Pérez2007 ER - TY - STD TI - Rachmat F., Song, L., and Lee, S. (2009). “Applying a Stochastic Linear Scheduling Method to Pipeline Construction”. Conference: 3rd International Conference on Construction Engineering and Management, ICCEM & ICCPM, May 2009, pp 154–162. ID - ref12 ER - TY - STD TI - Trofin, I. (2004). Impact of Uncertainty on Construction Project Performance Using Linear Scheduling. Master Thesis, Rinker School of Construction, University of Florida, Gainesville, FL. ID - ref13 ER - TY - JOUR AU - Wyrozębski, P. AU - Wyrozębska, A. PY - 2013 DA - 2013// TI - Challenges of project planning in the probabilistic approach using PERT, GERT and Monte Carlo” JO - Journal of Management and Marketing VL - 1 UR - https://doi.org/10.12737/1437 DO - 10.12737/1437 ID - Wyrozębski2013 ER -