Table 2 An example – wall material take-off

From: Deconstruction waste management through 3d reconstruction and bim: a case study

<Wall material takeoff>
A B C D E F
Material: name Type Phase demolis Material: volume Unit cost ($/m3) Cost ($)
Asbestos
Asbestos Hazardous materials Phase 3 0.42 m3 300 124.874983
Asbestos: 26
Brick, common
   0.42 m3   124.874983
Brick, common   Phase 7 508.92 m3 300 152,675.861538
Brick, common: 60
Concrete masonry Units
   508.92 m3   152,675.861538
Concrete masonry units Atrium wall 100 Phase 7 10.06 m3 300 3019.045148
Concrete masonry units UTS-exterior-wall-240 Phase 10 180.48 m3 300 54,142.794872
Concrete masonry units: 69
Gypsum wall board
   190.54 m3   57,161.84002
Gypsum wall board UTS-exterior-wall-240 Phase 10 18.05 m3 300 5414.279487
Gypsum wall board: 57    18.05 m3   5414.279487
Grand total: 312    717.92 m3   215,376.856029