Table 4 Schedule of Inspections (Source: Richard Crookes Construction, 2016)

From: Deconstruction waste management through 3d reconstruction and bim: a case study

Item Inspection type Notice
Services before disconnection or diversion. Hold point 3 days
Trees specified to beretained before demolition. Hold point 3 days
Contents of building before demolition. Hold point 3 days
Structure after stripping and removal of roof coverings and other external claddings. Hold point 3 days
Excavations remaining after removal of underground work. Witness point 3 days
Site after removal of demolished materials. Witness point 3 days
Services after reconnection or diversion. Witness point 3 days