Skip to main content

Advertisement

Springer Nature is making SARS-CoV-2 and COVID-19 research free. View research | View latest news | Sign up for updates

Table 2 Detailed resource information

From: A semi-automated approach to generate 4D/5D BIM models for evaluating different offshore oil and gas platform decommissioning options

Resource Category Name Notes
Equipment Cutting Tools To separate connections between modules
Heavy Lift Vessel (HLV) To Lift modules and structures from platform to vessel and then ship them to land
Materials Chemicals (Cleaning) To clean empty pipes and tanks before lifting
Materials (Fastening) To fasten and strengthen modules before lifting
Labor Cleaner Use chemical materials to clean and empty pipes, etc.
Separator Use tools to cut connections between modules
Fastener Use materials and equipment to fasten modules
Lifting Assistant Help during lifting
Crane Operator Operate crane on HLV
Project manager Take charge of the whole decommissioning project
Other Engineers Calculate lifting points, plan the lifting path, etc.